The locations proposed are for consultation. A decision will then be made on the final selection. It is anticipated that up to 4 locations will be selected. There is also a dock move.
The locations have been chosen from cycle use data therefore there are various locations for consideration.
It is anticipated that the docks could be in place in Sept 2023.
The proposed locations can be found by clicking on the links below:
Share
Share on Twitter Share on Facebook